Every two years, ERCOT puts out a report called the Long Term System Assessment. This year's version is one of the most shocking reports from a grid operator you'll ever see.
The LTSA is a projection looking out to 2039 with a range of possibilities. This year's LTSA looks at current trends and two high load growth scenarios.
ERCOT currently has about 170…

