The Texas Energy and Power Newsletter

The Texas Energy and Power Newsletter

Ghost Demand | Reading and Podcast Picks - September 6, 2026

Tesla’s solar roof; Chevron investment in Venezuela; AI as good grid citizens; Combating clean energy disinfo; and Columbia Energy Exchange on critical minerals.

Texas Energy & Power Media
Sep 06, 2026
∙ Paid

Reading and Podcast Picks is a collection of what we’ve been reading and listening to over the last week or so about energy topics.

In addition to these R&P Picks, paid subscribers receive access to the full archives, Grid Roundups, and select episodes of the Energy Capital Podcast. Please subscribe today.

Texas’ halt on powering data centers reflects US reckoning over ‘ghost’ demand | Reuters

Nobody actually knows how much of the data center planning hitting grid operators right now is real. Drawing on Governor Abbott’s data center moratorium, Reuters looks at why this is a national problem, not just a Texas one.

The uncertainty around data center electricity use, said Tyson Slocum, director of the Energy Program at consumer advocacy group Public Citizen, raises the risk that utilities either under-build and threaten the stability of the grid, or overbuild to serve projects that never materialize, leaving average Americans footing the bill.

“I think part of what (Texas) is trying to do is to create some order, and impose some transparency, on an industry that in much of the country is still like the Wild West,” Slocum said.

Close-up of roof with solar panels that look like black roof tiles, brick and white wood home
Tesla’s solar roof via The Washington Post

Tesla ditches solar roof — and embraces regular solar panels | Canary Media

Tesla’s solar roof never really took off as the company anticipated. Canary Media reports the company is now putting its marketing behind standard solar panels instead, with a possible Texas factory in the mix.

Tesla’s Texas solar factory — if built — would be an enormous, though not inconceivably large, investment relative to the domestic supply chain. The filing does not disclose capacity figures, though it notes the facility would create nearly 10,000 full-time jobs. In May, trade publication PV Magazine reported that the U.S. had, in total, $14.5 billion worth of operational solar manufacturing facilities. Another $22.2 billion were under construction.

User's avatar

Continue reading this post for free, courtesy of Texas Energy & Power Media.

Or purchase a paid subscription.
© 2026 Texas Energy and Power Newsletter · Privacy ∙ Terms ∙ Collection notice
Start your SubstackGet the app
Substack is the home for great culture