In late October, Will Conkling told the Texas Energy Summit that Google supports ERCOT’s batch zero process, the one-time study of pending large-load requests to connect to the grid, and Gov. Greg Abbott’s audit of the data centers waiting in line. We recorded the conversation there, about a week before Texans elected Gina Hinojosa governor. She has promised a moratorium on data center approvals. ERCOT files its audit reports on Dec. 10.

Conkling makes a case for data centers that connect to the grid and bring their own power. He says Google has contracted 8.5 gigawatts of new supply in Texas and is designing sites with power company AES and Intersect, a data center development company Google bought in March. The projects pair on-site generation with a grid connection. Google also signed about a gigawatt of utility contracts that trade faster hookups for cutting demand when the grid is stressed.

On this week’s Energy Capital Podcast, Joshua Rhodes talks with Conkling, who leads data center energy for Google in the Americas, about how Google’s plans to grow in Texas and the questions the industry faces here.

The rest of the conversation:

  • Who pays: why Conkling says load growth spreads the grid’s fixed costs over more megawatt-hours, and why Google pays for the power it contracts even when it uses less. “If I use two, I pay for ten.”

  • Communities: why Google dropped nondisclosure agreements in local talks except for trade secrets and physical security, an Iowa farm town where it promised to leave the aquifer alone, and a nonprofit leader’s push for open books.

  • Carbon dioxide, water and air: operating emissions down 2 percent in 2025 despite record growth, and air cooling at its new Texas sites, which trades water for energy. Conkling disputed one questioner’s premise that data centers will double the state’s emissions.

  • Longevity: Google’s first data center building, in Oregon, still runs, and new facilities are built for chips a decade out.

  • From the room: why Conkling calls the state’s slowdown rational, and whether Google would buy capacity from a virtual power plant (many small resources dispatched together) in ERCOT, as it did in PJM. He says Google is exploring it.

  • Gas: the Illinois gas plant with carbon capture Google signed as a pilot, the gas plants in its Texas supply that rarely run, and other developers’ gas-only, off-grid plans.

  • Plus: 35 gigawatts of contracted clean energy, a $40 billion Texas commitment, training for 1,700 electrical workers, and the nine jobs he ties to each data center job.

Share

Chapters

  • 00:00 – Introduction

  • 02:19 – Two decades of Google data centers and how it buys energy

  • 07:02 – ERCOT's Batch Zero process

  • 09:08 – Grid connection versus behind-the-meter power

  • 12:18 – Flexibility, demand response and virtual power plants

  • 15:32 – What Texas communities are asking for

  • 18:21 – Speed to power versus building for the long term

  • 21:31 – Carbon, water and air

  • 25:16 – Why load growth could lower costs

  • 28:26 – Q&A: Texas regulation and emissions

  • 29:55 – Q&A: virtual power plants in Texas

  • 30:56 – Q&A: community engagement

  • 32:40 – Q&A: gas-only data centers

Resources

People & Organizations

Company & Industry News

Books, Articles & Filings Discussed

Related Podcasts by Energy Capital

Related Posts by Texas Energy & Power

Transcript

Joshua Rhodes: Welcome to Energy Capital, where we cover the decisions, data, and debates shaping the Texas grid and energy future. I’m your host, Joshua Rhodes. Today’s guest is Will Conkling, who leads the team that buys power for Google’s data centers across the Americas. He joined Google’s energy team in 2014 as its third member, and by the end of 2025, the company had 35 GW of clean energy under contract worldwide. We recorded this live at the Texas Energy Summit on October 27th, so the rules Will describes are rules as they stood that week, and several of them could change.

We got into grid connection versus on-site power, Google’s flexible demand contracts, and why Will says data center growth can lead to lower costs for other consumers. The audience pressed him on emissions, transparency and natural gas. A big thanks to Will for taking the time, and the Texas Energy Summit and the Texas Energy Systems Laboratory for having us.

Let’s get into it.

Well, welcome, everybody. Excited to be here. I’ve got my little cheater screen up here that normally when I’m doing a podcast, you can’t see ‘cause I’m looking straight at it, whenever the video side of things. Yeah, really excited to be moderating this fireside chat. My name is Joshua Rhodes.

I wear a bunch of different hats. University of Texas, IdeaSmiths, also host, now host of the Energy Capital Podcast, and I’m joined by Will Conkling, Director of Data Center and Energy Power for Americas, Google. Welcome to the stage.

Will Conkling: Thank you, Josh. It’s good to be here.

Joshua Rhodes: Absolutely. So can we start out, we got a little bit of an intro, but kind of as a, like a, I guess a question zero, can you just say Director of Data Center Energy and Power, comma, Americas, Google, what does that title mean?

What do you do?

Will Conkling: Yeah. So thanks for the Texas Energy Summit for having me here, and thanks for hosting, Josh. The Energy and Power team at Google, we are responsible for any electron that goes into our data centers, and data centers power all of our products. We have 10 to 15 products across the world that have 2 billion or more users, and all those products live in our data centers, and those data centers run on electricity, and our job is to buy the electricity as well as to meet all of our clean energy goals that we have set as a company around carbon-free energy and renewable energy.

And so if it’s an electron associated with a data center at Google, that’s us.

Joshua Rhodes: Got it. I should’ve mentioned earlier, we’re also recording this for an episode of the Energy Capital Podcast. Thanks to Andy Uhler over there. So excited to not only have this here, but you know, in perpetuity, so no pressure, Will.

Just kidding.

Two decades of Google data centers and how it buys energy (02:19)

Joshua Rhodes: All right. So Google’s been doing data centers, joke I was gonna say is back when they were cool, but whatever, we can get to that point. Like, all right.

Will Conkling: They’re still cool.

Joshua Rhodes: Yeah, they’re— no, exactly. I know. Y’all been in the data center business for a long time. You’ve had to power those data centers.

So, you know, looking back 10 years, your role in the power sector has evolved pretty dramatically with the mention of the 20 GW of power. You’ve got lots of PPAs, power and procurement, regulatory models. You’ve acquired Intersect Power. You’re signing multi-gigawatt generation agreements with the data centers.

Like, that’s a lot of big decisions. You know, what decisions are you, including those, are you making right now that’s gonna change and impact the, you know, the energy sector here in the state?

Will Conkling: Sure. So it’s true, we’ve been doing large-scale data centers for a long time. Our first one opened up, I think, in 2003, and we’ve been growing our footprint of data centers ever since.

I joined the company in 2014, about 12 years ago, and I was the third person on what was a fledgling energy team at the company, and we have seen an immense amount of change and growth over the years since then. And we’ve been building large-scale data centers as a company since, you know, before people were talking about hyperscalers and talking about AI and talking about all that sort of stuff.

And we were building them for search and ads and YouTube and maps and all the things that we provide to our customers and our users and everything that a lot of us use every day. So we’ve got, you know, 20-plus years of experience partnering with energy providers and utilities and communities and many other folks to build energy responsibly and to build data centers responsibly and to be a part of communities.

In doing so, we’ve learned a lot, and we have sort of evolved our approach to making sure that we’re focusing on energy affordability, right? We’re focusing on investing in communities and being a good partner to communities. We’ve always done that. And we’re focusing on, and as people have alluded to, making sure that we’re building out power generation to supply our needs.

The number 20 GW has been used today. It’s actually 35 GW as of the end of 2025 globally, and that’s just clean energy, right? And that doesn’t incorporate other energy we bought, and that’s wind and solar and batteries and hydro and nuclear and everything else. But when we come back to energy affordability, the goal is for us is to make sure that we are paying 100 percent for all the energy we consume.

That means all the transmission, all the distribution, all the generation. We partner deeply with energy providers and utilities to ensure that we design contracts and rates that make sure we pay and that we don’t socialize those costs as we grow. Investing in communities, we want to make sure that we’re very focused on community benefits and being a good neighbor and a good citizen wherever we go.

We do things like job training, where we’re actually investing a ton of money now in Texas to train 1,700 electrical workers, energy workers in the state to ensure we train the labor force. And we also have an energy impact funding program nationwide, but along with our $40 billion in investment we announced in Texas last year, $30 million of Texas energy impact funding that’s going to go towards resiliency.

Saw Cliff on the resiliency part. Resiliency and job training and energy efficiency and improving schools and HVAC and that sort of stuff, right? So those are just some of the things we’re doing when we talk about investing in communities. On the bring your own generation part or bring your own power part, I talked about the 35 GW, right?

That was end of last year. We’re gonna keep going, and we are keeping going in 2026. And the last thing we want is a data center that has anything but, you know, low-cost, reliable power. And so in order to get that, we have to invest in the system and do what we do, which is to cause power plants to be built or build power plants to ensure that there’s sufficiency of supply.

Joshua Rhodes: It sounds like you’ve been doing this for quite a long time. I know that recently a lot of companies are starting up their energy folks, but so you’ve been around for 20 years or so.

Will Conkling: Yeah. I mean, Google’s had an energy team for a long time. We did our first PPA back in 2009, 2010, before I was here at the company.

But it was one of the reasons I wanted to come join as like, you know, looking at a company like Google who’s starting to take responsibility and accountability for its own energy supply was really inspiring to me, and it’s why I came. And well, I got lucky. It’s a coincidence that it became what it has become today, but it certainly is deep in our DNA as a company that energy is the foundation of a lot of what we do.

Joshua Rhodes: Yeah, as someone who works in energy, I say energy is the foundation of everything we do.

Will Conkling: It’s so true. Yeah.

Joshua Rhodes: So true. No, totally. I’m glad to hear about the workforce training and stuff. I wanna pull on s— a few of those threads later, but it just, it did spark, it reminded me kind of, you know, West Texas became a hub for like, you know, training wind turbine technicians and things like that as it became a hub for that, for that region.

You go out to Sweetwater, you know, Texas State Technical College. A lot of people come from around the country and the world to, you know, get trained up and—

Will Conkling: Yeah, you know, one of the things that I like to cite and I’m very proud, for every job that we create in a community for data centers, which is thousands, there’s a 9-to-1 multiplier on jobs that in the community and in the state, right?

And so in addition to building great products, buying lots of energy, we’re also a major economic development engine and a job creator in the communities we’re in, which is gratifying.

Batch Zero (07:02)

Joshua Rhodes: Yeah. So let’s dig into a little bit kinda some of the things that are going on in Texas. So things are moving quickly.

Texas has fundamentally changed how it handles large load interconnections in ERCOT’s new Batch Zero process. Before we had, like, a lot of large loads wanting to connect, it was kind of an ad hoc process. Like, the large load would go to the transmission service provider, and they would do a study, and if they figure out what it took to get them to connected and go.

But, you know, with all, with a lot of large loads, it required a more kinda centralized kinda process. So given that the process has kinda changed, how’s Google, you know, been navigating that transition from where you sit? What’s working well? What’s challenging? You know, has it affected how you’re, you know, looking at planning developments here in the state?

Will Conkling: Yeah, look, it can’t help but affect us, but it’s actually a process that we’re very supportive of. The old way of doing things where you’re looking at the system, and building the system, and developing the system sort of one project at a time or one application at a time doesn’t scale, doesn’t work right.

And obviously what is happening right now is scale and velocity. And so we were advocates for and supporters of the sort of batching process, right? I mean, we think that’s the right way to go about this. And in doing so, I think you bring a lot more order to the system, and you bring a lot more stability and confidence in sort of how it’s being planned and how it’s being built out.

It has to be built out reliably. It has to be done in a way that sort of looks out for all Texans and, you know, aligns with our goals too, right? Around sort of making sure that there’s a reliable system that we can connect to and be served by. So, you know, we also think that the next challenge is, okay, now with that batching process, like how do you design the market and products and systems such that customers that do it right and maybe can provide some flexibility as well as generation and investment in the grid can get high-confidence pathway towards a connection in Texas, right?

And I think that’s good for all involved.

Joshua Rhodes: Yeah, no, I think, yeah, we had to introduce some discipline into that, into that more ad hoc system, and I’ve been calling that audit kind of the step zero of the Batch Zero process. We’ll see where that goes, but I imagine, you know, what it is like, you know, everybody who’s filling out one of those audits wants to have the best answers to those questions, right?

Will Conkling: But we have the best answers, though.

Joshua Rhodes: Fair enough. Yeah. Yeah.

Will Conkling: Sorry to break it to the rest of the folks.

Joshua Rhodes: No, man. I get it. All right.

Grid connection versus behind-the-meter power (09:08)

Joshua Rhodes: So that’s like, you know, connecting to the grid, but there’s a ton of, you know, discussion about bringing own generation, being off grid. You know, there’s a lot of talk about behind-the-meter generation or building the concept of energy parks by co-locating, you know, new data centers with new generation. As the guy who’s getting the power, how do you view the trade-offs from kinda either behind the meter or islanded, if y’all are looking at that, or, you know, being connected to the local grid? Like, it seemed to be only before everything was connected to the grid, but given the pace, like, there’s a couple different options out there.

Like, how are you viewing those?

Will Conkling: Sure. We’re taking a, for lack of a better word, an all-of-the-above strategy on how this goes, right? But I will say, you know, we are not leaning hard into sort of long-term behind-the-meter or islanded power. It’s a solution for a specific time, and I think some specific problems to solve.

But we see connecting to the grid, bringing our own generation in various different forms as the way to go. Why is that? Well, first, you said everyone would be connected to the grid the first time, right? And that’s true, and so we brought 8.5 GW of energy supply to Texas that are, you know, new to the grid based on contracts we’ve signed.

So that’s step one is make sure that there’s supply sufficiency on the grids where we operate. There is a speed-to-power component here. It is true that co-locating load with generation can provide benefits in terms of velocity and timeline. That is driven by the sort of infrastructure timelines to improve the grid and build out transmission versus the timelines that sort of data centers wanna come online.

And so we are partnered with, well, we purchased Intersect and have designs and products with them, and we are partnered with companies like AES in Texas to design co-located hybrid sites that have both a grid connection and generation on site. And we think this is the right middle ground in some cases because it has both affordability and reliability benefits for us, but also for the system.

And the affordability benefits are that if the system is peaking and prices are high, we can generate our own power, right? And then we aren’t actually adding to that price condition. At the same time, when prices are lower and there’s low utilization on the grid, we can draw power from the grid, which actually lowers costs for all because we’re spreading the fixed cost of the grid across more megawatt-hours.

At the same time, there’s a reliability benefit where if the system again is peaking or under duress, we can make sure that we can provide some power or our own power and be less of a problem for the grid. And so this idea of co-location and behind the meter, I think the pure behind-the-meter side is probably not gonna be a big part of our strategy over the long term, but this co-location does make a lot of sense.

And it makes a lot of sense also, you know, if we’re gonna be a grid customer, we have to actually invest in the grid, and we have to pay for its improvements, and we will do that. And but while that’s happening, we can still connect and start to become a customer and a citizen of the grid. And so you see this sort of parallel track of generation and transmission, which are on different timelines, but ultimately lead towards this setup where a configuration where you have load and generation together connected to a grid and everything’s working kind of in symbiosis.

Joshua Rhodes: You mentioned the different timelines a few times, and I think that’s part of, like, the tension here in terms of, like, how fast different pieces of this can move, but you need the whole thing, you know, at some point. You need the grid, the connected component, to work.

Flexibility, demand response and virtual power plants (12:18)

Joshua Rhodes: I remember when I first started seeing these numbers come out years ago when it was, like, 80 GW, and I was like, “What?

That’s a lot.” And then it was like 200, and then it got bigger and bigger and bigger. I mean, one of the first things that I was starting to talk about was, okay, well, if you wanna bring in some big loads, like, how flexible can these things be? Like, either demand response programs or other types of stuff.

So I know that that’s starting to also— or that is being discussed and folks are bringing things around that. So you’ve joined NVIDIA, Emerald AI, other players in the space like Energy, Vistra and AES, which you mentioned earlier, to launch the AI Energy Management Alliance. Can you talk about what flexibility means for Google data centers, and then kinda what that means for, like, how the grid sees those data centers?

Will Conkling: Sure. We think it’s really important to better use the system we have while also building out the system that we want for the future, right? And the grid definitely needs to grow and expand and needs investment. We’re gonna do that. We’ve talked about that. But we also think that there’s a real benefit in give and take to be had between loads and demand, and demand flexibility plays a big part in this.

We’ve been actually investing in this for many years, initially sort of sensitive in reaction to the ability to sort of flex demand around price or flex demand around carbon intensity. And so we’ve developed this sort of capability that actually is very, very useful for grids today, which is we can flex up and down our demand in certain data centers in response to grid conditions and congestion and that sort of stuff.

And to date, we’ve actually signed about a gigawatt of that across different contracts across the country where utilities have said, “Yes, Google, if you do that, we will provide you capacity sooner than we would have otherwise,” because, you know, we don’t have to build power plants to serve it or build more transmission.

And that’s good for us because it gets us online sooner. You know, maybe 1 percent of the year you have to turn down, but the rest you can run. But it’s also good for the system because it provides resilience, and it provides sort of growth as well. The ability for us to do that is actually really enhanced by the fact that we’re now running AI in these data centers, which is a more flexible workload than we’ve had in the past.

You know, the knock against data centers for many years was they can’t be flexible, they have to be up all the time. That’s actually less and less true, and especially when you’re incorporating things like batteries and you’re incorporating this on-site generation I talked about, you can look like a much different customer to the grid than you have in the past.

The other side of this is looking at distributed energy resources and, like, demand response in other parts of the system. Just a week or two ago, we announced a deal with a company called Voltus in, up in the PJM market in the Mid-Atlantic for 1 GW of what we’re calling a virtual power plant, I think probably pretty familiar to folks in the room, which in that market can provide capacity similar to if you were to sign a contract with a power plant.

And again, that sort of demand flexibility, we think is really key to sort of how data centers and grids and large loads and just the system overall are gonna work well in concert. Certain studies have shown that this kind of flexibility for customers can provide tens or $100 billion of benefits back to customers in terms of savings.

Duke University released a study that said if you were to be able to sort of flex even, like, less than 1 percent of demand, you could unlock another sort of 100 GW, right, of capacity across the US, which is an immense amount of power, and it’s not just in the interest of data centers, it’s in the interest of economic growth, in the interest of the system, in the interest of the country.

And so we think flexibility is a big role to play, and we are, you know, transacting live in that space right now.

What Texas communities are asking for (15:32)

Joshua Rhodes: Yeah, absolutely. So one of the things, you know, regardless of, like, flexibility or co-location or what, these things have to live somewhere, right? So let’s talk a little bit about, you know, communities and where these data centers are living.

So as the development has, you know, accelerated, communities have come up with a lot of questions around what it means for jobs, tax revenues, electricity costs, water, quality of life, and there’s been a groundswell and pushback against a lot of... that feels relatively new. What are you hearing from, you know, Texas communities?

Like, what are you learning about being a good neighbor? Like, you know, what should communities expect when a responsible, you know, data center developer moves in? You mentioned not all data centers are the same, and I bet that means not all developers are the same. What should communities be expecting?

Will Conkling: Yeah, so I talked about in my opening remarks about, you know, data centers done right and what that means, right? And it’s actually the sort of approach we’ve taken for a very long time. But if you wanted to distill it down, you know, our approach is the following: you know, communities are expecting transparency, so they wanna know who you are, what you’re doing, when you’re doing it, and how you’re doing it.

And to that end, you know, we’ve done away with and are no longer, but for, you know, cases of trade secret or sec— or physical security using NDAs when we approach communities and wanna go to develop a data center there, right? They also want a focus on energy affordability. I’ve talked a lot about that, but you know, we have invested immensely in making sure that, A, we’re bringing resources to the system that supply our demand, but also we invest a ton of time, both in Texas and across the country, around designing the right rates and contracts that ensure that, you know, come what may, we’re paying our way and we’re not socializing costs.

The third thing that people are really focused on in communities is sort of stewardship of natural resources and water and air and this sort of stuff, right? And that’s always been very much in our DNA and foundational to sort of the work that I’ve been doing for a long time. And so clean energy should definitely be a part of the mix, but what type of generation you use is big focus when you do have co-located generation, making sure you’re doing that in a responsible way.

The other area is around investing in communities and making sure you’re providing community benefits back, right? We’ve talked a little about that already, but you know, wherever we are, we’re making sure that first we’re listening to what people want, what’s important to them, and where the needs are, whether it be on energy affordability or local infrastructure or, you know, schools and libraries.

We partner deeply with the communities that we’re in. And the last bit is around jobs and job creation and making sure that you’re training, hiring locally and providing a reason for folks to stay in their hometowns, for example, right? We’ve talked to some states and some regulators, and they said, “You know, our biggest export is our people, our young people,” right? It’s because there aren’t jobs in small towns or in rural communities or in some of these states.

And I come from a small state, a small town in a small state, and I’m really proud of the fact that we provide really high-quality jobs for people to s— you know, stay where they’re from and be around families. And so job creation and job training is a big focus for us as well.

Joshua Rhodes: Yeah, I come from a small town in a big state, and similar dynamics there.

Speed to power versus building for the long term (18:21)

Joshua Rhodes: The term speed to power has come up a couple times in the conversation already. You know, data centers seem to be willing to make extraordinary, bring buckets of money to the situation to, you know, to build infrastructure to, you know, connect as quickly as possible. And this is one of my favorite questions ‘cause I get to nerd out a little bit, but I imagine at some point, like in this system, like the unit cost per token, which if you’re not familiar, like token is like the actual output of these AI models.

So when my students, you know, ask it to cheat on their homework for them, it’s the words that they generate or the code that is generated. No. So, UT says it’s not cheating. Anyways, digressing, but like the token is like the unit output of, right, there’s input tokens, output tokens, now I’m getting way too in the weeds.

But like at some point the unit cost per token, the thing that you’re actually, like the AI models are actually creating when in inference will become, I imagine, extremely important, particularly as we use more and if there’s constraints on infrastructure. Like how do you make sure that a data center that you know is built for speed to power is up for the task today, but you know, also for whatever, you know, tomorrow might bring?

Will Conkling: Sort of what makes my job hard is we have to go fast and be high quality and be— you know, thinking about the long term and all this sort of stuff, right? And so we’ll step back for a second. As I mentioned earlier on, Google’s been building data centers for a long time. We’ve been in the data center business since the early 2000s, back when they were cool.

And—

Joshua Rhodes: I appreciate you going with the joke.

Will Conkling: Today, I’m happy to report that the first data center building we ever built in Oregon is still operating today and still sort of useful, right? Can it house the latest TPUs from, you know, and AI chips? Well, of course not, right? But it still does very, very useful things for us and serves a lot of customers.

And so this sort of tension between speed and longevity actually isn’t one we are too worried about because when we design data centers, we’re designing them such that, you know, we can put today’s chips in them, tomorrow’s chips in them, and even chips, you know, 10 years from now continue to operate.

For the 12 years that I’ve been at Google, up until 2023, we were— our electricity consumption, which is basically data centers, was growing 20 to 25 percent a year, give or take. And so that meant that we were doubling our energy consumption, which is now somewhere north of 40 TWh globally. We were doubling our energy consumption every four to five years.

And so that meant that data centers we turned on last year or five years ago or 10 years ago, you know, are still very, very useful for us, right? We need to use them. We’re growing a little faster than that now, and I think what’s gonna happen is you’re gonna see a burst of data center construction now to meet this moment.

You’re gonna see some great products get built. You’re gonna see the cost of those products go down, and because there’s great products at a low cost, you’re gonna have demand for those products, and then those data centers are gonna be useful for us for a long time. It would not make any sense for us to invest all the money we are in our infrastructure and only expect to use it for a few years.

Our goal is to use it for a very long time and very productively and, you know, in turn be very, very responsible and focused, you know, members of communities because we are investing for the long term.

Joshua Rhodes: Yeah, no, absolutely. Just but in the context of the room, ERCOT’s knocking on the door about 500 TWh.

Now, I’m sure that not all that 40 TWh is in Texas.

Will Conkling: No, it’s global. Yeah.

Joshua Rhodes: Oh, totally. But just to put a number, it’s a lot.

Carbon, water and air (21:31)

Joshua Rhodes: So let’s talk about some of the environmental impacts of that energy use. So, you know, data centers bring a variety or a range of environmental considerations, including electricity-related emissions, local air quality, water consumption, cooling requirements.

You know, Google’s been a leader in this like 24/7, like carbon-free pledge by 2030. What environmental practices or commitments, or what are communities expecting on that regard for data center developers? What should they expect?

Will Conkling: Yeah. So the environmental focus is a big one for us, and it’s near and dear to me, and one of the main reasons the company is around this sort of, this challenge of carbon emissions, right?

For a number of years now, had this 24/7 carbon-free energy goal, which means on an hourly basis, we’ll, as to the greatest extent possible, match or actually not even match, sort of, you know, supply energy to our data centers from carbon-free sources. Before that, we had an annual goal, and see me afterwards if you wanna talk about the wonkery of annual versus matching and all this sort of stuff.

But when we set that 24/7 matching goal, we sort of knew it was gonna be a moonshot, right? Sort of a stretch goal. The path there has been non-linear. It is challenging. It means we have to do a lot of wind and solar and batteries, but it also means we have to do things that are still emerging, like, you know, long-duration storage and nuclear and geothermal.

Nuclear has emerged, reemerging, and then some parts of nuclear are emerging for the first time, but geothermal and that sort of stuff, right? And so carbon is a big focus for us. In 2025, we grew faster than we’ve ever grown before in terms of energy consumption. Our carbon emissions from operations went down by 2 percent, right?

And so it is a major focus of ours. But the other parts of the environmental side here are actually quite local, and if you look at communities, what they’re worried about, right, is they’re worried about water consumption and water use and water sufficiency, and they’re also worried about air emissions and that sort of thing.

And so when we talk about water, Google uses a very sort of data-driven process when it thinks about how to cool our data centers. There’s many options to do that, right? In some places, there’s, you know, the water supplies are resilient, there’s plenty of water, and actually it makes a lot of sense to use water for cooling.

In Texas, that’s not the case, and so we are not using— going forward, we’re not using water for cooling in Texas. We’re using all the sort of new emerging technologies around cooling data centers and air-cooled and all this sort of stuff. And at the same time, we are pledging and committing to, by 2030, to replenish more water in the systems that we do operate with water cooling, do projects to build infrastructure and to invest in the community to actually replenish more water than we use.

And so water for us is one that we talk to a lot— to communities a lot about, and actually it’s sort of where we listen most to communities about sort of what they want and what they’re worried about and ensure that we’re not affecting their access to water for agriculture or for basic needs. On emissions, you know, and air quality, you know, I think we have a very good story to tell there.

We, of course, use backup generators like a lot of data centers do. We never run those backup generators for any economic dispatch or for any sort of needs other than when the grid goes out, right? So it’s emergency use only. And then when we do build generation on site, we’re using emissions control technology, and we’re making sure that we’re doing it in the most responsible way, but also leaning hard into things like wind and solar and batteries first before we even go towards anything that burns.

We think that’s the right strategy from a sort of risk management and financial standpoint, but it’s also the right strategy for communities and our emissions and the environment. And so those are the main factors we’re seeing out there and that’s how we’re addressing those concerns.

Joshua Rhodes: Got it. Yeah.

On the cooling aspect, like using the dry cooling or what I used to call dry cooling, I guess maybe colloquially known as air cooling, like it requires more energy, right? So there’s trade-offs there in terms of like how much your connection can go to IT versus like cooling, right?

Will Conkling: For sure. Yeah. So it makes your data center less optimized from an energy standpoint, but it’s more optimized from a water standpoint, or it’s more sensitive to the water context around it, right?

So yes, you do use more energy if you use less water. That’s the continuum. But in a place like Texas where you have plentiful, you know, solar, wind, and other resources, that’s not a bad trade-off. Yeah.

Why load growth could lower costs (25:16)

Joshua Rhodes: Yeah. That makes sense. All right, so looking ahead, you know, 10 years from now, the numbers are all over the place.

Five years from now, 10 years from now. In your mind, like looking back 10 years, what would you say would have been this done the right way versus like the wrong way?

Will Conkling: Yeah. The narrative out there right now is that, you know, this is a threat or this is a major challenge for the grid, and it is a challenge, like there is growth.

And the reason it’s a challenge is because until 2022, 2023, the grid was growing very, very slowly. The energy consumption was zero to 0.5, maybe 1 percent growth across most systems. And now we’re somewhere in that sort of 2 to 5 percent per year range of growth, which, you know, sounds modest, but if you compare it to zero or 0.5, that might be 10X, right, in terms of growth rate.

So there is growth to happen, and there’s a challenge there, but actually, I think this is undoubtedly an immense transformative opportunity for grids. And why do I say that? If data centers were not growing the way they are, the grid would still need tens of billions of dollars of investment in order to, you know, sort of expand it, make it more reliable, make it more resilient.

And if you do that on the same amount of consumption, it’s a recipe for costs only to go up, right? Because you have fixed costs into the grid and you have the same number of megawatt-hours, basic math says that the unit cost is gonna go up. If at the same time you have growth and you have large loads that are flat, around-the-clock loads that are growing into the consumption part of that while you’re also putting money into the fixed cost of the grid, you’re actually spreading that cost over a larger amount of megawatt-hours, which is gonna re— put downward pressure on the unit cost of energy for everyone.

And so data centers are providing not only a catalyst for growth, but also a force for reducing the amount of it that prices are gonna go up for all as that grid does grow, which it has to do regardless. The second part of this is that I talked before about the contr— the contracts we’re signing, so yes, we’re causing some— we’re causing the grid to grow, but we’re also committing and we’re signing contracts such that we’re committed long term to pay for that growth and pay for what we’re using, and do so in a way that is insulated from, you know, exactly how much we actually use.

So if I sign a contract for ten units of energy and I use eight, I pay for ten. If I use two, I pay for ten. And so regardless of whether or not I use it, I’m still helping invest and grow the grid. The other part that’s transformative here is all the sort of new technology that’s starting to actually emerge and deploy that might not actually otherwise have happened if there was not this sort of growth impetus.

We’re seeing that across the country, whether it be geothermal, long-duration storage, small modular reactors, which we’ve invested in, nuclear upgrades, turning nuclear power plants back on that had retired. We’re seeing all kinds of virtual power plants. I’ve talked about demand response, these sort of things that are emerging out of necessity because of the growth.

We wouldn’t have seen that, and I think in 10 or 15 years from now, you’re gonna see a very different system with very different technologies than you might otherwise have had. And so the transformation is real. It’s an opportunity, I think, for, in the state of Texas especially, to set itself up well for the long term on a system.

Joshua Rhodes: Yeah, no, absolutely.

It’s much easier to invest in a something that’s growing versus something that’s, you know, stagnant.

Will Conkling: Exactly. 100 percent.

Q&A: Texas regulation and emissions (28:26)

Joshua Rhodes: Yeah. All right, so I think we’re getting to the end of our time. I think we have time for a couple or a few questions, and we’ll get the folks to help get a microphone out. I think there’s one here in the center that I got first.

Audience member: Thank you so much. Thank you so much for being here today. Can you talk a little bit about some of the challenges you have in the regulatory environment in Texas that are unique to Texas that you don’t have as many barriers with? Or on the inverse, what are some of the successes that Texas is doing that is allowing this infrastructure to grow?

Will Conkling: Yeah, there’s two sides to that. I mean, the nice thing about Texas is that it does generally support infrastructure growth, and it d-does generally sort of want investment and folks like us to come here. It is geographically and resource-wise set up really well from having the right resources, wind, solar, and this sort of stuff, right?

And those conditions have, in this moment in time with data centers, have created a, I mean, I can’t call anything but like a blitz, right? So there’s, you know, data centers have seen that and have piled in, and that has generated a reaction and a rational one from regulators and from the governor that says, “Hey, guys, let’s, like, slow down.

Let’s make sure we’re doing this the right way.” And, you know, that’s both a challenge and opportunity, right? It means that, you know, things might not happen as fast as some had hoped, but it also means that when it does happen, it’s gonna happen in a way that is sustainable and res— and responsible and that, you know, folks like us can be happy with, but also Texans can be happy with.

And as I mentioned, that’s a process we really support.

Audience member: The data centers are going to double the energy use in the state of Texas. Therefore, it’s going to double the emissions. Nobody talks about that part of it. They all talk about the electricity, and they all talk about the water, but nobody talks about the emissions and the, and the ozone level.

It’s going to double by the data from the, from ERCOT, which is Energy Reliability Center of Texas. It’s going to, again, double the electricity usage. So by 2031, the ozone level within this region will double. What are you all plan to reduce that emission?

Will Conkling: So respectfully, I disagree with the premise of the question.

Y— yes, electricity growth is going to happen, but so much of that electricity growth is going to be served by sources of power that don’t actually have those emissions, right? Talked about what we do. We have 8.5 GW of contracted power that’s about— is operating or coming online in Texas over the next few years.

That’s all clean energy. It’s wind, it’s solar, it’s batteries, right? We also, yes, are going to have some gas generation that’s in the mix of that, but that gas generation is there for firming and peaking and reliability and will actually be very low capacity factor, right? And so even if you see 100 MW of natural gas generation go in, you have to look at what type of generation it is and how it’s gonna be used and what the emissions profile of that use actually is.

And we don’t grow in 2025 like we did and drop 2 percent in operating emissions on our carbon emissions without building a lot of clean energy that doesn’t have those emissions involved. And so I would say that not all of that growth is gonna come from emitting resources, and that’s certainly one of the main points of my role and my job is to make sure we don’t do what you’re afraid of.

Q&A: virtual power plants in Texas (31:50)

Audience member: I was excited by what you said about what you’re doing in PJM, but of course, PJM has a capacity market, and I’m against capacity markets, so I’m not going there.

But my question for you is there a world in Texas where Google or other data centers could be investing in virtual power plants which could help consumers, but also help overall meet energy use? Does that exist today here in Texas? Could you do something similar to what the announcement you made up in PJM?

Will Conkling: We’re exploring it right now. S-short answer. I would like to be able to do a transaction like that in Texas. You have to get the market signals right, and you have to get the product right, and so there’s financial benefits for sure, right? That’s one thing. That’s not the main reason that we would do it.

The main reason we would do it is if it provides reliability or resiliency or additional growth on the system without having to sort of like build new stuff all the time, right? And so I think exactly how you write those rules matters and how the ERCOT and the PUC are gonna figure that out. But we would like there to be a transaction there, and we’re working on advocating for the right rules and talking to suppliers of those products, yeah.

Q&A: community engagement and transparency (32:51)

Audience member: Hi there. Thank you so much for this chat today. Sorry.

Will Conkling: You’re fine.

Audience member: Um. I’m just gonna follow him then.

Will Conkling: Yeah. I don’t know where y’all are.

Audience member: Just for context, I’m a social scientist who talks at a really granular level to communities where data centers are being built.

Will Conkling: Yeah.

Audience member: And you had some interesting comments about configuring data center build-out to the location and the communities that you’re approaching.

Can you tell me a bit about what those conversations look like? Are you talking to mayors, city leadership, EDCs? Are you talking to the ground-level community members? And how do those negotiations of what’s best for a location go about? Thank you.

Will Conkling: Sure. So even for Google, all development is local. I used to develop, you know, wind and solar and other power plants, and it was true then, and it’s true now.

We have staff, and we have folks on the ground who are embedded in and talking to communities and making sure that when we start to think about a project, the first thing we do is go to a community and say, “This is who we are. This is what we’d like to maybe do. But as part of that process, what’s important to you, the community?”

An example would be up in Iowa, for example, we’re developing a project now, and, you know, you think about Iowa, you think about, okay, well, there’s probably plenty of water there, right? But what actually this town is worried about, they’re a farming community. There’s an aquifer that they use to get water for farming, and the last thing they want is for us to sort of use that aquifer water for data centers.

And that, and we went out and said from the get-go, “We will not touch the aquifer. There’s no way that we’re gonna do that, and that because it’s important to the community.” There’s lots of different ways you can cool a data center, as I mentioned, right? And it’s a spectrum between how much energy you use, how much water you use, and then the cost of that data center, and it’s not in our interest to do what a community doesn’t want us to do if we’re gonna be there for 20 or 30 years.

And so it starts with a conversation. It starts with what’s important to them, and we have staff locally who are doing that, talking to mayors, talking to county commissioners, talking to judges in Texas, and making sure we’re being sensitive to the local context, yeah.

Audience member: Well, I apologize for that certainly, ‘cause it did not matter.

But once again, we do appreciate you being here. I know the conversations surrounding concerning data centers, and that’s a conversation. There are a thousand questions and comments that I could make in regard to it, but one that you touched on specifically that was just addressed, communities. Are you being transparent with the communities from both sides of the angle?

You know, the environmental impact. I’ve heard conversations that the water is to be recycled, this kind of thing, over and over again, so it won’t have that much of an impact on communities. Where are these centers being located? And who’s gonna pay for the price? And that’s in regard to the transparency aspect of it.

Is the communities gonna pay for it? You know, when you spoke of the mayors and the elected officials, they don’t necessarily live in the communities where these data centers are being ha— uh, being located. So my concern is the overall transparency. Is the book being open so that this conversation can take place with community members, with community leaders, and with elected officials that are in those communities so that everybody is aware of what is taking place? I’m over a nonprofit, and our motto basically, “If you’re not at the table, you’re on the menu.” So we want our communities to be, have that seat at the table so that they can have that conversation like I’m having with you now, and that’s taking place in here, so that we will understand exactly what is taking place and the overall impact that a data center is gonna have in our communities.

Will Conkling: Sure. You know, I said we talk to mayors and county commissioners and judges and that sort of stuff. We don’t do that in back rooms. We do it at community meetings, right? And we have staff who show up at community meetings, and they have to present to those communities and take comments and take feedback, and at the end of the day, we need their approval.

We need permits. We need building permits, that sort of stuff, in order to be able to build, and if they don’t want us, it means we’ve done our job poorly and we haven’t been transparent and we haven’t done, you know, what communities want. And it means also we’ve failed at our jobs of delivering capacity for the company of data centers, right?

And so transparency as it is top of the list. People who live in communities are naturally, I think, a little suspicious of someone like me and of Google, and the only way to sort of convince you that we mean what we say is to show up and be transparent about what we’re doing, show you our plans, talk to you about where our water’s coming from, and talk to you about how we’re gonna shield customers and ratepayers of utilities from shouldering the costs of our infrastructure and, you know, our energy, making sure we’re focused on affordability.

Talk to you about how we’re gonna create jobs. Talk to you about how we’re gonna sort of invest in the community, which we do all the time. And conversations like this that are gonna sort of make that better, and what we do is we show up in towns and we talk to you.

Q&A: carbon capture and gas-only data centers (37:35)

Audience member: Thank you for your talk. I was wondering, have you looked into the possibility of usage of underground storage spaces, you know, to be able to manage the supply-demand during the, for example, peak seasons?

Because Texas is very rich in those kind of storage spaces like salt caverns, and they can store both renewable and fossil fuels. I was just wondering if you have looked into it.

Will Conkling: So I think the question was, have you looked at underground storage caverns for part of our development and activities? The short answer is yes.

The way we’ve approached that is obviously building data centers. We’re buying power, maybe we’re producing power, and that power comes from various sources. The most obvious one that comes to mind is when you do use gas, is it possible to capture and sequester the gas and, you know, carbon capture and sequestration, right?

And this is a, an emerging field, emerging technology. It’s one that we’re investing in. We’ve signed a contract for power from a natural gas power plant that will in fact capture and sequester all the carbon up in Illinois as kind of like a pilot or a test. It’s being done now in the ag industry where already where you’re putting carbon underground, and we think it’s a promising technology in the right places and only if you can’t find other ways to do clean energy, and that doesn’t involve gas at all, right?

And so short answer is yes for carbon capture and sequestration and, you know, deploying that in various spots across the country where the right geology exists and where the right... Well, where you can’t find other alternatives. Yeah.

Audience member: Yes, sir. Just a quick question about your assertion that I guess it’s Google is primarily using green energy and renewables.

I am personally aware of multiple developments that plan to just use natural gas. So I’m just kinda trying to understand the seeming disconnect between the assertion that Google, I guess, is just gonna use green energy, whereas I’m aware that the... seems like the bulk of the independently created developments are going to use natural gas, specifically the ones that are gonna be islanded.

So I’m just kinda curious if you can speak to that.

Will Conkling: I don’t think all data center developers are the same. Not all data centers have a energy team that is as focused on doing the right thing and doing it responsibly the way that we do. But I’d say that, you know, for us, we intend to continue to drive towards our carbon em— reduction and carbon emissions goals and carbon-free goals.

As I said, end of 2025, 35 GW of clean energy across the globe, 8.5 GW in Texas, continuing to sort of aggressively buy more. We think it’s the right strategy, and it’s the right sort of strategy as far as, like, reliability and resiliency and cost management goes as well.

You know, start with wind and solar and batteries, those are the cheapest sources, and add what you have to sort of make a reliable system, right? I can’t speak for what other data center developers are doing. I do think that I know there are some out there doing exactly what you’re saying. I think that there’s a lot of sort of strategic and business issues around that approach that I think will eventually rear their head, and you’ll see a little less of it over time.