The hidden truth is that PJM's challenges are not solely about data centers. They stem from a system designed for an era when load growth was relatively predictable and gradual. Data centers accelerated the problem by turning that growth vertical. When demand begins moving at that speed, planning processes must move just as fast. Texas recognized that challenge early, and part of the foundation was the Large Flexible Load Task Force (LFLTF), an ERCOT stakeholder group that helped develop some of the state's first structured approaches for managing large, flexible loads. Credit belongs to the LFLTF and the grid veterans who brought decades of operational experience to the table and helped keep the discussion grounded in reliability.

"Hat-tip to one of the architects of the LFLTF — the King of Electricity." Wilton Smith Round Rock

Joshua Rhodes's avatar

Agreed, that’s why I think that Texas will solve the large load problem first, with FERC led states following, maybe.